BackVersion v2.8 (November 2026)

Defect Management Agreement

This Defect Management Agreement ("Agreement") is made between the client and the contractor named in the project summary. It sets out how defects in the completed works are reported, tracked, accepted and rectified through this platform. It takes effect when both parties have confirmed it, and it operates alongside the building contract for the works.

1. Status of this Agreement

This Agreement is supplemental to the building contract between the parties. It does not vary the contract sum, the scope of works, the specification, the completion date, or general payment terms agreed in that contract (with the exception of the retained sum), and it does not transfer any obligation from one party to the other. Where this Agreement and the building contract conflict on those general matters, the building contract prevails. However, in the event of any conflict or inconsistency between this Agreement and the building contract specifically regarding the reporting, tracking, acceptance, management, and rectification of defects, or the calculation, management, and release of the retained sum, the terms of this Agreement shall take precedence.

2. Statutory rights preserved

Nothing in this Agreement excludes, restricts or replaces any right either party has under statute or at common law. This includes the contractor’s duty to carry out the works with reasonable care and skill (Consumer Rights Act 2015, section 49, where the client is a consumer), the duties owed in respect of dwellings under the Defective Premises Act 1972, and the limitation periods that apply to those rights. The defect liability period is a contractual period that operates in addition to those rights, and the closure of the platform record does not cut them short.

3. Defect liability period

The defect liability period begins on the date recorded in this project and runs for the agreed number of days. During that period the contractor will rectify defects in the works caused by faulty workmanship or materials, or by a failure to comply with the building contract, at no additional cost to the client. The client may report defects through this platform at any time during the period, and may also raise a matter by other means if the platform is unavailable.

4. Rectification period and closure of the record

At the end of the defect liability period a 14-day rectification period allows any outstanding reported defects to be completed. When that period ends, the project record on this platform is closed. Closure is administrative: it records that the reporting window has ended and that no further defects can be logged here. It is not a final certificate, it does not release the contractor from any liability, and it does not affect any right either party has under the building contract or at law.

5. Acceptance of completed rectification

When the contractor marks a defect as complete, the client may accept the rectification or dispute it. If the client has not responded within 72 hours, the rectification is recorded as accepted so that the record can progress. However, if the project’s 14-day rectification period expires before this 72-hour window has elapsed, the rectification is instead automatically placed in dispute with the note "defect completed, however not reviewed by client within timeframe", and the defect stays open on the record for the client. Acceptance confirms only that the reported defect has been rectified to an acceptable finish. It is not acceptance of the works as a whole, and it does not prevent the client reporting a further defect, or a recurrence of the same defect, during the defect liability period.

6. Client responsibilities

The client agrees to provide safe and reasonable access to the property for inspection and rectification, to respond to acceptance requests within the time allowed, and not to obstruct or delay the contractor’s reasonable attempts to inspect or rectify. The client must report defects promptly with a clear description, location, and photographic evidence where available. The client acknowledges that any reported defect must be genuine, reasonable, and strictly proportionate to the contracted scope of works. Defect reports must appropriately account for standard building tolerances, reasonable expectations for the materials used, and the pre-existing finish or condition of the surrounding property, and may not be used to raise general wear and tear or matters outside the contractor’s contracted scope.

7. Contractor responsibilities

The contractor agrees to respond to defect reports within a reasonable time and to inspect and rectify valid defects in a professional and timely manner. All rectification work must be carried out in accordance with the building contract, current industry standards of good workmanship, and accepted building tolerances. The contractor’s obligation to rectify is strictly limited to defects arising directly from their own workmanship or supplied materials, and excludes issues resulting from pre-existing property conditions, general wear and tear, or subsequent damage by the client or third parties not under their control. The contractor agrees to keep the platform record updated as work progresses, to provide clear photographic evidence of completed rectification, and to ensure the affected area is left clean and safe upon completion.

8. Retained sum

Where the parties have agreed a retained sum, this platform records the amount calculated from the total project cost: 15% for projects up to £999, 10% for projects between £1,000 and £4,999, and 5% for projects of £5,000 and above. The platform does not hold, control or transfer money. The retained sum is held and released by the client in accordance with the building contract, and the figure shown here is a record of the agreed retention, not a payment instruction, an escrow arrangement or a trust.

9. Evidence

Photographs, notes, dates and acceptances recorded here are evidence of the condition of the works at the time they were recorded. Geotagged and date-stamped images are encouraged because they carry more weight, but a defect report will not be rejected only because an image lacks location metadata. The record may be used in negotiation, adjudication, mediation, arbitration, court proceedings or an insurer’s assessment.

10. Disputes

The parties will first try to resolve any dispute through the project record and direct discussion. Where the contractor is a member of the Federation of Master Builders, either party may refer the matter to the FMB’s free dispute resolution service. Nothing in this clause prevents a party from using another alternative dispute resolution provider, exercising a right to adjudication where the Housing Grants, Construction and Regeneration Act 1996 applies to the building contract, or issuing court proceedings.

11. Notices, variation and severability

Notices under this Agreement may be given to the email addresses recorded in the project. This Agreement may be varied only by a written amendment confirmed by both parties in this platform or signed by both. It forms the whole agreement between the parties on the management of defects, together with the building contract. If any provision is found to be unfair or unenforceable, the remaining provisions continue in full force and that provision is read down to the minimum extent necessary.

12. Platform Liability, Regional Use, Governing Law and Jurisdiction

The parties acknowledge that this platform is provided solely as an administrative aid to facilitate communication and record-keeping, and that its use is entered into in good faith by both parties. The owners, creators, and operators of this platform are not a party to the building contract or this Agreement. To the maximum extent permitted by law, the platform owners and creators shall bear absolutely no liability for any direct or indirect losses, damages, legal claims, or lawsuits arising from the use, malfunction, or unavailability of the platform, nor for any disputes, actions, or omissions between the client and the contractor. The app and its creators and employees offer no legal or technical support in relation to situations arising between the parties. They are not dispute resolution consultants, and they will not provide support, advice, or representation to either party in any dispute, claim, or disagreement between them. While the platform may be utilised for projects located outside England and Wales (such as in Scotland or Northern Ireland), the parties acknowledge that the platform and this Agreement have not been assessed against or tailored to the statutory rights, building regulations, or governance frameworks of those regions. Parties using the platform in other jurisdictions do so entirely at their own risk and assume full responsibility for ensuring that this Agreement and their use of the platform comply with their local legal requirements. This Agreement is governed by the law of England and Wales, and the courts of England and Wales have exclusive jurisdiction, unless the building contract provides otherwise.

13. Electronic signature

Each party signs by typing their full name and drawing their signature. The parties agree that electronic signatures and electronic records are valid and binding for the purposes of this Agreement, in accordance with the Electronic Communications Act 2000. Each signatory confirms that they are the party named in the project, or are authorised to sign on that party’s behalf, and that they have read and understood these terms.

I confirm that I have read and understood this Agreement, that I am the party named in this project or am authorised to sign on their behalf, and that I accept these terms. I understand this is a legally binding agreement and that it does not affect my statutory rights.

This is the exact wording presented for signature in the app and printed on the project defect statement.